Question : 36

Completeness in software system is referred as

a) Extent to which all the parts of a software system or component are present and each of its parts is fully specified and developed.

b) Testing of individual hardware/software components

c) An Entity-relation (E-R) diagram show how entities in the system are composed of other entities.

d) It consists of wide range of different types of computer programs, which be used to support software process activities such as a requirement analysis, system modeling, debugging and testing.

Answer: (a)

Question : 37

In system modeling : A-Model; B-Prototype;1- it’s an abstract view of a system that ignores system details; 2-It’s an initial version of system software which givers end-users a concrete impression of the system capacities

a) A-1, B-2

b) A-1, B-1

c) B-1, A-2

d) A-2, B-2

Answer: (a)

Question : 38

An accident is

a) Unplanned events, which results in injury, damage to property, or to the environment

b) Quantitative measure of the magnitude of error

c) Period that starts when a system is considered and ends when the product meets its initial operational capability

d) All the above

Answer: (a)

Question : 39

Mutable requirements are

a) Requirements that change due to the environment in which the organization is operating

b) Emerges due to user’s understanding of system

c) Dependent on particular system

d) None of these

Answer: (a)

Question : 40

Cost of ownership is

a) Process of estimating the costs associated with software development projects that include the effort, time, and labor required.

b) Overall cost of maintaining a computer system that includes the costs associated with personnel/training/ maintenance of hardware and software/ requirements growth.

c) Overall cost of operating a computer system that includes the costs associated with personnel / training / system operations.

d) Overall cost of a computer system to an organization that includes the costs associated with operating/ maintaining the system, and the lifetime of operational use of the system.

Answer: (d)

IMPORTANT computer mcq EXERCISES

software engineering Shortcuts »

Click to Read...

software engineering set 5 Online Quiz

Click to Start..
295 software engineering based computer MCQ set 5 question answer with explanation pdf

Recently Added Subject & Categories For All Competitive Exams

Most Important Antonyms Vocabulary - IBPS Clerk Prelims 2024

Latest Antonyms multiple choice questions and answers with free PDFfor IBPS Clerk Prelims 2024. English Vocabulary practice exercise for all bank exam

17-May-2024 by Careericons

Continue Reading »

Syllogism Practice Questions Answers PDF - IBPS Clerk 2024

Practice Verbal Reasoning Syllogism multiple choice questions and answers with Fully solved explanation, PDF for the IBPS Clerk Prelims 2024 Bank Exam

16-May-2024 by Careericons

Continue Reading »

IBPS Clerk Prelims 2024 Synonyms Questions Solved Answers

Most important IBPS Clerk Prelims 2024 Synonyms and Antonyms multiple choice questions and answers with detailed solutions, English vocabulary PDF Download

14-May-2024 by Careericons

Continue Reading »

New Cloze Test Questions and Answers PDF - IBPS Clerk 2024

The most important Cloze Test questions with detailed answers for upcoming IBPS Clerk prelims 2024. Latest English verbal ability practice MCQs, PDF

13-May-2024 by Careericons

Continue Reading »