Questions : System architecture model identifies

(a) Hardware components

(b) Software components

(c) Virtual components and software components

(d) Hardware and software components both

The correct answers to the above question in:

Answer: (d)

Practice software engineering (software engineering set 4) Online Quiz

Discuss Form

Valid first name is required.
Please enter a valid email address.
Your genuine comment will be useful for all users! Each and every comment will be uploaded to the question after approval.

Read more software engineering Based Computer Questions and Answers

Question : 1

In Data tension

a) It shows the software process as a set of activities each of which carries out data transformation.

b) Data and associated programs are reengineered to remove limits on the data processing

c) It is responsible for the definition, operation, protection, performance, and recovery of a database.

d) Development of a database to meet a user’s requirements

Answer: (b)

Question : 2

Hazard avoidance

a) Hazard cannot arise due system design.

b) The probability of the event occurring which create a hazard.

c) An assessment of the worst possible damage, which could result from a particular hazard.

d) A condition with the potential for causing or contributing to an accident.

Answer: (a)

Question : 3

Role is

a) Avoiding catastrophic moment

b) Ease with which a system or component are modified to fit the problem area.

c) It is a bounded area of responsibility

d) None of these

Answer: (c)

Question : 4

Requirement Engineering process does not involves

a) Feasibility study

b) Requirement elicitation and an analysis

c) Requirement validation and management

d) Data processing

Answer: (d)

Question : 5

CASE work benches support

a) Individual process tasks

b) Process phases and activities

c) Development software

d) Operation software

Answer: (b)

Question : 6

Database administration

a) It shows the software process as a set of activities each of which carries out data transformation.

b) Data and associated programs are reengineered to remove limits on the data processing.

c) It is responsible for the definition, operation, protection, performance, and recovery of a database.

d) Development of a database to meet a user’s requirements

Answer: (c)

Recently Added Subject & Categories For All Competitive Exams

100+ Quadratic Equation Questions Answers PDF for Bank

Quadratic Equation multiple choice questions with detailed answers for IBPS RRB SO. more than 250 Attitude practice test exercises for all competitive exams

03-Jul-2024 by Careericons

Continue Reading »

IBPS Aptitude Linear Equations MCQ Questions Answers PDF

Linear equations multiple choice questions with detailed answers for IBPS RRB SO. more than 250 Attitude practice test exercises for all competitive exams

03-Jul-2024 by Careericons

Continue Reading »

New 100+ Compound Interest MCQ with Answers PDF for IBPS

Compound Interest verbal ability questions and answers solutions with PDF for IBPS RRB PO. Aptitude Objective MCQ Practice Exercises all competitive exams

02-Jul-2024 by Careericons

Continue Reading »

100+ Mixture and Alligation MCQ Questions PDF for IBPS

Most importantly Mixture and Alligation multiple choice questions and answers with PDF for IBPS RRB PO. Aptitude MCQ Practice Exercises all Bank Exams

02-Jul-2024 by Careericons

Continue Reading »